Half of Farmington Hills was built between 1950 and 1979, and the city's biggest building year was 1985. That is a lot of forty and fifty-year-old basements with original mechanicals and no egress window. The city lists basement finishing by name as permit work, and we pull it.
Request a walkthrough →The median house here dates to 1978, and the city has been essentially built out since the vacant land ran short after 2000.
The single largest decade at about twenty-five percent of the housing. The city's peak year was 1985, when nearly 2,400 units went up. Taller pours and better layouts than the decade before.
Another twenty-two percent. Sound full basements with ductwork routed for convenience rather than for a finished ceiling.
Roughly twenty-eight percent combined. Lower ceilings, older mechanicals, and the most headroom recovery work of anything in the city.
About fifteen percent, and the easiest to finish. Open-space subdivisions and cluster housing were the dominant pattern here.
This is a market of forty-five to seventy-year-old basements. Two items show up on most estimates here.
The single most common line item in this city. Moving a trunk line is usually the cheapest usable height you can buy.
Michigan is still on the 2015 residential code, which requires an emergency escape opening for a finished basement whether or not it has a bedroom. Most original Farmington Hills windows come nowhere close.
Basement finishing appears by name on the city's list of work requiring a permit. There is no ambiguity here, which we appreciate.
The city publishes examples: electrical covers the sump pump and new circuits, plumbing covers water distribution over ten feet, heating and cooling covers the furnace and ductwork. A typical basement with a bath trips all three.
Downspouts, weep tile and footing drains cannot discharge into the sanitary system. Sump discharge goes to the storm sewer through an enclosed system with a minimum four-inch pipe. If yours is tied to the sanitary, that gets fixed first.
Farmington Hills requires a permit for use changes and ownership transfers, with a re-occupancy application and a floor plan. Doing the basement on permit is the version that does not create a problem at closing.
Farmington Hills permits through the Building Division, part of Planning and Community Development on West Eleven Mile Road. As of early March 2026, all building permit applications and inspection requests moved to the city's online portal, replacing paper applications and phone-scheduled inspections.
The city does not publish a plan review turnaround, so we build a realistic buffer into your schedule instead of promising one we cannot control.
Most of our basement work runs $60,000 to $95,000 against a Farmington Hills median around $395,000, putting a mid-range project at roughly nineteen percent of the house. Projects here run toward the middle and upper-middle of our range, mostly because of the two items that show up on nearly every estimate in this city: gaining headroom under original ductwork, and cutting and framing an egress opening where none exists.
Family room and media wall, designed around the headroom the house actually has after the ductwork moves.
See the service →A plumbing and venting question, settled before framing rather than after.
See the service →What turns a finished basement into a guest suite. Below-slab drainage decides the layout.
See the service →Floor flatness and clearance under the ductwork decide the location. We find the best section on the walkthrough.
See the service →Often the first phase in this city. Moving a trunk line changes what the whole basement can be.
See the service →Bedroom, bath and sitting area, with egress and sound separation handled properly.
See the service →Anything not answered here, call Tim directly at 313.236.0985.
Yes. Michigan is still on the 2015 residential code, which requires an escape opening for any finished basement. Anyone telling you otherwise is quoting the 2021 code, which Michigan has not adopted.
Usually quite a lot. In this city the ductwork is the problem more often than the pour. Moving a trunk line and using recessed lighting instead of a dropped ceiling gets most people where they need to be.
For a basement with a bathroom, yes. The city publishes examples and a typical basement finish trips electrical, plumbing and mechanical. We pull all of them.
Yes. The city does not allow footing drains, weep tile or downspouts to discharge into the sanitary system. It gets corrected before the basement is finished, not after.
It can. Farmington Hills requires a permit for ownership transfers and asks for a floor plan with the re-occupancy application. Doing the work on permit is the version that does not surprise you at closing.
Most run eight to twelve weeks from permit to final, longer when headroom or drainage work comes first. The city does not publish a review time, so we build in a buffer and tell you what it is.
Full service area across Oakland, Wayne, Macomb, Washtenaw and Monroe counties.
Tim walks the basement, tells you what the height and the mechanicals will allow, and gives you a straight answer before anyone talks about price. Free, about an hour.