A kitchen is four trades working in the same room in the right order. When that sequence slips, the schedule doubles. We plan it before demolition and hold the crews to it.
Request a walkthrough →Sink, range, and refrigerator placed around how you actually cook and clean up.
Ordered early, measured twice, and installed level on walls we corrected first.
Dedicated circuits, code-required outlets, and lighting on separate switching.
Relocations planned in the drawing, permitted, and inspected.
A hood sized to the range and ducted outside, with makeup air where required.
Continuous into adjacent rooms so the kitchen does not read as a patch.

Cabinets have lead times, inspections have queues, and countertop templating cannot happen until the boxes are set. We build the schedule backwards from those fixed points so the crews arrive to work that is ready for them.
Anything not answered here, call Tim directly at 313.236.0985.
No, but we set up a temporary kitchen with the refrigerator, microwave, and sink access wherever it makes sense.
We do, from the specs you approve. Ordering early is the single biggest schedule protection.
Often yes. If the wall is load bearing we bring in engineering and price the beam separately.
Cabinetry, then whether plumbing and gas lines move. Finishes matter less than people expect.
We will tell you what the work actually involves and give you a real price range. No deposit, no sales visit.