Everything that goes wrong in a bathroom five years later is a waterproofing decision made in week one. We build the assembly first and set tile second.
Request a walkthrough →Bonded membrane, sloped pan, and sealed corners tested before tile.
Supply lines, drains, and venting corrected to code while the walls are open.
Fan sized to the room and ducted outside, not into the attic.
Layout drawn before the first cut so grout lines land where they should.
Cabinetry, tops, and lighting selected to fit the room, not the catalog.
Curbless entries, blocking for grab bars, and comfort-height fixtures on request.

A bathroom is a small room where six trades work in sequence. We plan that sequence, open the walls to see what is actually behind them, and correct the plumbing and venting before anything decorative happens.
Anything not answered here, call Tim directly at 313.236.0985.
Four to seven weeks for a full gut. If it is the only bathroom, we sequence the work to shorten the downtime and tell you which days are hardest.
Yes, and it saves money. Moving drains and vents is what drives the plumbing cost up.
We give you the specs and dimensions that work, then you choose. We install what you pick.
Usually, if the joists allow the recess. We check the framing before we promise it.
We will tell you what the work actually involves and give you a real price range. No deposit, no sales visit.