Outdoor structures fail at the connections: the ledger, the footings, and the fasteners. Built correctly, they outlast the deck boards on top of them.
Request a walkthrough →Poured to depth and inspected, so the structure does not move through a Michigan winter.
Flashed and fastened into solid framing, the detail that causes most deck failures.
Galvanized or stainless connectors specified for the load and the exposure.
Composite or cedar, with railing that meets code height and spacing.
Posts sized and anchored for wind load, not just appearance.
Even risers, solid stringers, and low-voltage lighting run before the boards go down.

Metro Detroit puts a deck through forty freeze cycles a year. We build to that: footings below the frost line, a flashed ledger, and hardware rated for exposure. The finish is what you see, but the structure is what you are buying.
Anything not answered here, call Tim directly at 313.236.0985.
Composite costs more up front and less over time. Cedar looks better on a traditional house but needs sealing. We price both.
In most of our communities, yes, above a certain height. We pull it and handle the inspection.
Only if the framing and footings can carry it. We check before quoting.
Spring through fall. We schedule footings early because the inspection queue gets long in May.
We will tell you what the work actually involves and give you a real price range. No deposit, no sales pitch.