More square footage that reads like it was always there. Foundation, roofline, and trim matched to the existing structure and character of the house.
Request a walkthrough →Checked with the municipality before design, so the plan is buildable where you want it.
Footings and walls poured to match the existing structure and frost depth.
Tied in so the addition reads as original, not appended.
Existing walls opened and headered with engineering where the load changes.
HVAC capacity, electrical service, and plumbing verified before the space is added.
Siding, brick, and trim sourced to blend with what is already on the house.

How we approach it
The tell on a bad addition is always the roofline or the siding seam. We start with zoning and the existing structure, design the tie-in first, and confirm the furnace and panel can actually serve the new space before we frame it.
Anything not answered here, call Tim directly at 313.236.0985.
Design and permitting run 6 to 12 weeks depending on the municipality. Construction follows that.
Only briefly, and controlled. We frame and dry in the addition before cutting the connection.
Usually close, rarely exact on an older home. We show you samples before committing, and sometimes recommend a deliberate transition instead.
Not always. We run the load calculation first and tell you whether the existing system can carry it.
We will tell you what the work actually involves and give you a real price range. No deposit, no sales visit.