Rochester Hills drops 342 feet from its northwest corner to its southeast, and that terrain is why this city has more walkout and daylight basements than anywhere else we work. It is also why the city publishes an eleven-step inspection sequence. We know it.
Request a walkthrough →This is a young city on unusual ground. It only incorporated in 1984, and roughly half its housing went up between 1970 and 1989.
The largest single decade at about twenty-seven percent of the housing. Tall pours, square footprints, and basements worth finishing as they sit.
Another fifth of the stock. Sound basements with lower ceilings and ductwork that usually wants moving before anything else happens.
The reason this city is different. On lots that fall away you get a real door, real daylight, and a finished space that does not read as a basement at all.
The middle ground, and common here. Windows set high on one wall, enough light to make a family room genuinely work without a full walkout.
Rochester Hills documents this work more thoroughly than any other city we build in. That is a good thing, and it shapes how we draw.
Elevation runs from 690 feet in the southeast to 1,032 feet in the northwest. The city mapped its steep slopes and passed a slope ordinance in 2005, which can come into play on exterior excavation for a window well.
The city publishes numbers: 5.7 square feet net clear opening, minimum 24 inches high by 20 inches wide, sill no more than 44 inches above the floor. Window wells at nine square feet with 36 inches of width and projection, and a ladder if deeper than 44 inches.
The city states it directly. We measure to the lowest obstruction before we price anything, because that is the number you will actually live with.
Areas divided into sections not exceeding 1,000 square feet, shown on the drawings. This is the most common reason a Rochester Hills basement plan comes back for corrections. It is on ours before it goes in.
Underground plumbing through final building, including a separate energy and insulation inspection and an open ceiling inspection. More stops than most cities, and they are specific.
Two separate cities with two separate building departments. A Rochester 48306 or 48307 address can fall in either one. We confirm which before we file anything.
Rochester Hills states it plainly: a building permit is required before construction starts. Once it is issued, separate electrical, plumbing and mechanical permits follow as applicable. The city also publishes inspection criteria down to pipe slope and fire blocking intervals.
Underground plumbing at an eighth inch per foot, bath fans terminating three feet from any opening, wires six inches out of every box. We build to the published version, not to habit.
Most of our basement work runs $60,000 to $95,000. Rochester Hills sits around a $463,000 median, putting a mid-range basement at roughly sixteen percent of the house. The variable here is whether you have a walkout. A walkout with existing daylight and an existing door skips the most expensive part of a standard basement finish, which is manufacturing egress and light where there is none. It also tends to justify a higher finish level, because the space gets used like a main floor.
Family room and media wall. On a walkout lot this becomes the most-used room in the house.
See the service →Especially worth it on a walkout, where the basement functions as its own floor.
See the service →What turns a finished basement into a guest suite. Below-slab drainage decides the layout.
See the service →Floor flatness and clearance under the ductwork decide where it goes. We find the best section on the walkthrough.
See the service →When the lot falls away, we design to the door and the daylight rather than fighting them.
See the service →Bedroom, bath and sitting area, with egress and sound separation handled properly.
See the service →Anything not answered here, call Tim directly at 313.236.0985.
Yes. Michigan is still on the 2015 residential code, which requires an escape opening for any finished basement. The city publishes the exact dimensions, and we build to them.
Do not assume it does. Later editions of the national code added a walkout exception, but Michigan has not adopted those editions. We confirm the specific opening against the city's published spec before drawing.
It divides the concealed ceiling space into sections no larger than 1,000 square feet. Rochester Hills wants it shown on the drawings, and leaving it off is the most common reason a basement plan gets kicked back.
Not if they are sequenced properly. We book them in order and meet each one. The energy and insulation inspection is the one people forget, and missing it stops the job.
It can. The city mapped its steep slopes and has an ordinance covering them. We check that before we price the excavation rather than discovering it mid-dig.
Most run eight to twelve weeks from permit to final. Expedited permit processing inside 48 hours helps at the front end when the drawings are right.
Full service area across Oakland, Wayne, Macomb, Washtenaw and Monroe counties.
Tim walks the basement, tells you what the height and the mechanicals will allow, and gives you a straight answer before anyone talks about price. Free, about an hour.