Troy is a 1970s city. A third of its housing went up in that decade alone, and those basements were poured with the headroom and the footprint that make them worth finishing. If you have been putting this off, the house is probably on your side.
Request a walkthrough →Troy's median house dates to 1977, and four kinds of basement cover most of the city.
The largest single group in Troy. Full basements under most of the footprint, workable height, and mechanical layouts that are usually cooperative.
Long, wide basements with the furnace placed centrally. Often the easiest floor plans in the city because there is little to route around.
Taller pours and better original drainage. These start closer to ready than anything else in Troy.
Uncommon here, but where it exists the basement is a blank rectangle with good height and no remediation to do first.
None of these are surprises. They are what decides the number on a Troy basement.
Troy basements generally begin with more clearance than Royal Oak or Plymouth. That usually means your budget goes into finish level instead of headroom recovery.
Michigan enforces the 2015 residential code, which requires an emergency escape opening for a finished basement whether or not it has a bedroom. Original Troy windows do not meet it.
A large share of Troy sits in platted subdivisions with active associations, and the city itself recommends checking with your HOA before alterations. A window well changes the side of the house, so we raise it on the walkthrough.
Run for convenience in 1978, not for a finished ceiling. Moving a trunk line is often the cheapest usable height you can buy.
Troy requires a permit board at the jobsite, minimum 24 by 36 inches, with the building permit displayed on it. We bring it.
Troy's building department is paperless and accepts only electronic plans submitted by email. That speeds things up when your contractor is set up for it.
Troy's Building Department is on West Big Beaver Road, with a separate inspection line. Here is the part that catches people: you cannot pull a basement building permit online in Troy. Online permitting covers electrical, mechanical, plumbing, sewer and water, plus building permits for roofing, windows and siding only. A basement finish goes through the department directly.
Troy publishes its own basement finish guidelines. We read them before we draw, not after a correction notice.
Most of our basement projects run $60,000 to $95,000. Troy's median sale price is around $468,000, which puts a mid-range finished basement at roughly sixteen percent of the house. Troy jobs tend to sit in the middle of our range rather than the top, for a simple reason: the basements start in better shape. Less headroom recovery, less window enlargement, fewer surprises behind the mechanical room. The budget goes into what you are actually building.
Family room, media wall, and the seating that makes people use the space. Troy basements have the footprint to do this properly.
See the service →Mostly a plumbing and venting question, and one worth settling before framing rather than after.
See the service →What turns a finished basement into a guest suite. Drainage below the slab decides the layout, so we look at it first.
See the service →Troy's wider basements suit a real gym. Floor flatness and ceiling height under the ductwork are the two things that decide where it goes.
See the service →Plenty of Troy basements were partly finished in the 1990s. Some of that can stay. Most of it cannot.
See the service →When the mechanicals are due anyway and it makes sense to do the work together.
See the service →Anything not answered here, call Tim directly at 313.236.0985.
Yes. Michigan is still on the 2015 residential code, which requires an escape opening for any finished basement. Anyone telling you it is only a bedroom requirement is quoting the 2021 code, which Michigan has not adopted.
Not the building permit. Troy restricts online building permits to roofing, windows and siding. We file the basement permit with the department directly and handle the electronic plan submission.
Probably. Troy has a lot of active subdivision associations and the city recommends checking before alterations. The egress window well is the part they care about, because it changes the exterior.
Most Troy basements finish between seven and eight feet depending on the ductwork. We measure to the lowest obstruction on the walkthrough and tell you the real number before you commit.
If you want the space used for guests, yes. It is the single change that turns a finished basement into a guest suite, and the below-slab drainage decides where it can go.
Most run eight to twelve weeks from permit to final. Plan review in Troy is its own step, and we build it into the schedule you get with the fixed price.
Full service area across Oakland, Wayne, Macomb, Washtenaw and Monroe counties.
Tim walks the basement, tells you what the height and the mechanicals will allow, and gives you a straight answer before anyone talks about price. Free, about an hour.