Royal Oak's median house was built in 1956, and six out of ten went up before 1960. That stock came with small kitchens closed off from everything else, and plenty of them are still that way. Opening one up is the most common job we run in this city.
Request a walkthrough →Royal Oak's median house dates to 1956. Four kinds of kitchen cover most of the city.
About a sixth of Royal Oak was built before 1940. Small kitchens at the back of the plan, often with the basement stair and the back door running straight through them. Opening one up means solving circulation first, not cabinets.
The postwar wave, roughly one house in six. Kitchen closed off from the dining room by a full wall with a cased opening. On these, the wall is the whole conversation.
The largest single group in Royal Oak, nearly three houses in ten. Longer kitchens with more usable wall, and usually the easiest layout to open into the living side.
Only about one Royal Oak house in ten was built this century. Where they exist the kitchen is already open and the work is finish level, not structural.
None of these are surprises. They are what decides the number on a Royal Oak kitchen.
Not always, and we never assume it. But in a side-gable bungalow or a ranch the center wall tends to carry the floor above, which means a beam, temporary shoring and posts down to a footing. That is the line item people do not budget for.
Michigan exempts cabinets, countertops and similar finish work from a building permit. What pulls the permit is the wiring, the plumbing move and the wall. Anyone quoting you a permit-free kitchen that includes any of those three is wrong.
The city's residential fee schedule lists Kitchens by name under Alterations for plan review. There is none of the ambiguity you get in neighboring cities that only publish the word renovations.
Around five thousand Royal Oak houses were built in 1939 or earlier. In that group the kitchen is often still on its original circuit, and current code wants dedicated circuits and GFCI protection. Budget for the panel conversation.
Royal Oak requires a thirty-five foot rear yard and caps lot coverage at thirty to thirty-five percent. On a fifty by one hundred foot lot there is often no room to bump the kitchen out, which is why most of this work happens inside the existing footprint.
Royal Oak's construction site rules exempt renovations enclosed within the original building. An interior kitchen means no chain-link fence on your lawn and no portable toilet at the curb. Birmingham is different.
Royal Oak's Building Division is on South Troy Street, a few minutes from most of the jobs we run. Permitting here is online only, through the city's portal, and we are already set up on it. Plan review for a kitchen alteration is forty dollars, and the building permit runs twelve dollars per thousand of construction cost with a one hundred dollar minimum.
Royal Oak publishes no review turnaround, so we do not promise you one. What we do is file the day the drawings are done and tell you where it stands every week.
Most of our kitchens run $50,000 to $70,000. Royal Oak's median sale price is around $390,000, which puts a mid-range kitchen at roughly fifteen percent of the house. Royal Oak jobs land in the middle to upper part of that range more often than not, and the reason is almost always the wall. If the kitchen and dining wall is carrying load, the beam, the posts and the footing work are real money before a single cabinet gets ordered. We tell you which side of that line your house is on during the walkthrough, not after.
Same trades, one floor down. Worth settling the plumbing and the venting before the basement gets framed.
See the service →Layout, cabinetry, counters, electrical, plumbing, ventilation, floors and trim. Eight to twelve weeks, four trades, one schedule.
See the service →The half bath off the kitchen is usually on the same wall and the same drain. Doing both at once costs less than doing them a year apart.
See the service →Rarely possible in Royal Oak because of the rear yard rule, but worth checking before you assume. We measure the lot first.
See the service →The change that makes the biggest difference in a Royal Oak house. Beam, posts, load path to the footing, permitted and inspected.
See the service →When the wiring, the floors and the kitchen are all due at once, doing them together costs less than doing them in sequence.
See the service →Anything not answered here, call Tim directly at 313.236.0985.
Not a building permit. Michigan exempts cabinets, countertops and similar finish work. The moment you move an outlet, relocate the sink or touch the wall, you are permitted.
Usually yes, and it is the most common thing we do here. Whether it is load bearing decides the cost, not whether it is possible. We check the framing direction from the basement before we quote it.
No. Royal Oak exempts interior renovations from its construction site rules, so an inside kitchen job means neither. We work out of the house and keep your drive clear.
On most Royal Oak lots, no. The thirty-five foot rear yard and the lot coverage cap use up the room. We check your specific lot before ruling it out, but plan on working inside the footprint.
Eight to twelve weeks from permit to final on most Royal Oak kitchens. We set up a temporary kitchen somewhere else in the house on day one, because you are going to need it.
The city does not publish a review time, so neither do we. We file the day the drawings are done and tell you where it stands every week until it is in hand.
Full service area across Oakland, Wayne, Macomb, Washtenaw and Monroe counties.
Tim walks the kitchen, tells you what the wall and the wiring will allow, and gives you a straight answer before anyone talks about price. Free, about an hour.